top of page

LATEST PROJECTS

Oman Botanic Garden
​
  • Client: Diwan of Royal Court

  • Consultant Engineer: Bovis Lend Lease International Ltd.

  • Consultant: Currie & Brown Oman Ltd. 

  • Company: BAM International bv

  • Location: Al Khoud, Sultanate of Oman

  • March 2011 to November 2013

To see more or discuss possible work let's talk >>
  • Addition to my Role & Responsibility as Document Controller, I Extensively worked on Aconex.

  • Taught Aconex and the Project Document Management System (PDMS) and also the Document Flow Procedures of BAM International to the newly enrolled Omani National Document Controllers.

  • Headed team of 1+3 DC’s, monitored timely delivery of documents and always identified and rectified the mistakes of my Team and developed the solutions to avoid the data entry mistakes and provide an error free Documenting process by Programming in MS Excel.

  • Additionally involved in CSR – Corporate Social Responsibility conducted in Al Khoud School which was near to the Project Area.

  • Participated in Online Safety Awareness Contest conducted by BAM International bv and won iPad2 among 10000 participants.

Welcome Pavilion
​
  • Client: ALDAR Properties PJSC

  • Project Manager: Cyril Sweett Ltd.

  • Managing Contractor: ALDAR - BESIX

  • Consultant: Shankland Cox

  • Company: Higgs & Hill Interbeton Ltd

  • Location: Yas Island, Abu Dhabi, UAE

  • March 2009 to March 2011

  • My Role & Responsibility as Document Controller will remain same.

  • Joined Higgs & Hill Interbeton Ltd in July 2008.

  • Cleared 4 months Backlog as well as daily outgoing and incoming Documents registering and Filing the all Documents within 6 months.

  • In March 2009, I was ready to Lead new Welcome Pavilion Project independently.

  • My Role & Responsibility as Document Controller will remain same.

  • In this Project fortunately got an opportunity to Learn and work on ACONEX first time.

  • Got Training on basic as well as advanced various key features of ACONEX from ACONEX TEAM.

  • Reason to Leave Belhasa Six Construct is for better Prospect.

  • My Role & Responsibility as Document Controller will remain same.

  • Joined Belhasa Six Construct Ltd in 17 March 2005 as Trainee Document Controller for 6 Months and in end of year 2005 agreed to Handle Document Control Department independently as Company transferred the Senior Document Controller to new Project Awarded in Fujerah.

  • Preparing Letters to Consultant, Fax / Memo to Sub-Contractor, Minutes of Meeting, Maintaining Registers of Consultant and Sub-Contractor faxes & letters.

  • Registering the each document incoming & outgoing in Excel Log-Schedules & entering the same into the CSD. (Classification System for Documents – Developed in-house by IT Department)

  • Preparation of Transmittal of all Technical Document for submission and Managing distribution of the same (in house and towards Client/Subcontractor). 

  • Arranging the copies of the drawings required for the site.

  • Organizing and maintaining the filing system for the documents related to Secretarial & Technical Department.

  • Proudly from June 2007 till handing over of Project, handled Secretarial Duties to PM addition to Document Controlling.

  • Coordinating with Q.S and Technical Engineer for preparation of Snag List, Operation & Maintenance Manual and Submission of AS-BUILT Drawings for Successful Handover of Project.

Various Projects
​
  • Projects such as Asphalt Road Construction, Bridges Construction, Drainage and Sewage Construction, High Rise Building Construction, etc.

  • Company: National Contracting and Transport Company

  • Location: Sharjah, United Arab Emirates

  • May 1997 to January 2003

  • Started my career as a Document Controller for first time as Fresher.

  • Learned preparing Letters & Faxes to Consultants, Sub-Contractor, Suppliers.

  • Learned preparing Minute of Meeting.

  • Submission of Technical Document to Consultants

  • Distributing the same to Site Personnel.

  • Logging the Submitted and Received Document in Excel.

  • Filing and Proper book keeping.

Crowne Plaza & Staybridge Hotel
​
  • Client: ALDAR Properties PJSC

  • Project Manager: Cyril Sweett Ltd.

  • Managing Contractor: ALDAR - BESIX

  • Consultant: Kann Finch Group

  • Company: Higgs & Hill Interbeton Ltd

  • Location: Yas Island, Abu Dhabi, UAE

  • July 2008 to March 2009

Al Gurm Resort Development
​
  • Client: ALDAR Properties PJSC

  • Project Manager: Parsons International.

  • Consultant: Dar Al Handasah

  • Company: Belhasa Six Construct Ltd.

  • Location: Abu Dhabi, UAE

  • January 2008 to May 2008

Ministry of Foreign Affairs
​
  • Client: DSSCB (Department of Social Services & Commercial Building)

  • Project Manager: CRSS International.

  • Consultant: AEC (Architectural & Engineering Consultant

  • Company: Belhasa Six Construct Ltd.

  • Location: Abu Dhabi, UAE

  • March 2005 to January 2008

Anchor 2
Anchor 3
Anchor 4
Anchor 5
Anchor 6
Anchor 7

Project | 06

Project | 05

Project | 04

Project | 03

Project | 02

Project | 01

Follow me

© 2023 by Taranath Karkera.
Proudly created with
Wix.com
 

Call

T: +91-251-2483897   M: +966 54 919 7256

  • Facebook Clean
  • Twitter Clean
  • Google+ Clean
  • White LinkedIn Icon
bottom of page